Training Area 5 – Proposed FARP Site Survey
Dates: October 7, 8, and 14, 2020
Project Type: Military Aviation Infrastructure Planning
Location: Training Area 5
Equipment: TAG surveying equipment
Project Overview
The technical-engineering team conducted a detailed site survey to support the planning and evaluation of a proposed Forward Arming and Refueling Point (FARP). Fieldwork included surveying access roads and documenting existing features that could affect site layout, constructability, drainage, utilities, and aircraft-refueling operations.
Team Personnel
Senior Technical NCO: SSG Reid
Technical NCO: SGT Pupo
Survey Team: SPC Selwynndudoit, SPC Nordquist, PFC McDonald, PFC Bowman, PFC Peña, and PFC Kelly
My Role & Contributions
As a member of the survey team, I supported field-data collection using TAG equipment. I helped survey the surrounding roads and document significant existing conditions, including electrical poles, drainage ditches, ridges, and other site details relevant to preliminary planning and design.
Surveyed Features
Existing roads and site access
Electrical poles and utility constraints
Drainage ditches
Ridges and terrain changes
Additional existing-site details
Skills & Experience Gained
Existing-conditions surveying
Topographic and detail data collection
Road and access documentation
Utility and drainage identification
Site-planning support
Field coordination within a multidisciplinary team
Project Status
Proposed infrastructure project completed through the field-survey and preliminary planning phase.
Deliverable
Field-survey data and documentation of existing conditions to support evaluation and preliminary development of the proposed FARP site.